To minimise disruption to the community, the new bypass and valve chamber were prefabricated off-site, reducing construction time to eight weeks. Dewatering pumps and tanks were also used to safely manage groundwater during construction.

The upgrade included:

  • Constructing a new switchboard building to house new electrical components.
  • Installing a larger inlet pipe to improve the pump station's hydraulic capacity.
  • Constructing a new bypass connection point to the existing rising main.
  • Relining the maintenance hole to accommodate the new valve chamber and provide a durable internal surface.
  • Replacing corroded pipes within the pump well.

 

37 Banksia Avenue, Noosa Heads.

 

Unitywater Contact Centre
1300 086 489
customer.service@unitywater.com

Timeline

Late 2025
Preliminary investigations complete
Mid 2026
Construction complete
Mid 2026
Project complete