The disclosure log shows information released under the Right to Information Act 2009 that is considered to be of significant interest to the wider public. Under the Act, information of a sensitive nature, for example personal details and/or information considered commercial in confidence, is removed from the documents prior to their release.
The disclosure log below provides details of released documents that are available to the public.
Date released | Reference | Title | Information requested | Summary of documents released |
---|---|---|---|---|
10/11/2010 | RTI 02_2010-11 | Fluoride | Dosing Reports – Redcliffe Waste Water Treatment Plant | Dosing Reports: Redcliffe Waste Water Treatment Plant -Control of Influent Sulfide -Magnesium Hydroxide |
14/10/2011 | RTI 06_2010-11 | Sewage | Decision not to proceed with the proposed upgrade to the Woodford Sewage Treatment Plant | Various documents relating to the decision not to upgrade the Woodford Sewage Treatment Plant |
03/10/2011 | RTI 10_2011-12 | Water and Waste Water Plans | A copy of the Transitional Water and Wastewater Network & Services Plan 2011/12 and any material relating to a revised plan for 2012/13 | Transitional Water and Wastewater Network & Services Plans for 2011/12 and 2012/13 |
20/06/2012 | RTI 11_2011-12 | Compensation | Compensation, refund and adjustments for failing to meet customer service standards. | A document was prepared as result of extracting data from a Unitywater Database |
07/11/2013 | RTI 03_2013-14 | Sewer Network |
All documents related to the overflowing/backed up sewer line incident that occurred on 29 June 2012 at Parker Street, Maroochydore QLD 4558. Relevant documents may include work orders, repair records, attendance records, incident reports, service reports, loss assessment reports and any other documents related to the above mentioned incident. Any maintenance or repair records for the five (5) years preceding 29 June 2012, related to the sewer line that passes through the property located at Parker Street, Maroochydore QLD 4558. Any complaints or issues raised by any party for the twelve (12) months preceding 29 June 2012, regarding the sewer line that passed through the property. |
Records pertaining to the incident, including work orders and compliance report. |
07/07/2014 | RTI 13_2013-14 | Works conducted | Works conducted on Kerejon Avenue, Buderim in a 12 month period prior to 12/03/2014 | Copies of relevant work order / history |
18/07/2014 | RTI 14_2013-14 | Pipe construction/ maintenance | Construction and seven year work order history for pipes at Atkinson Road Bli Bli | Copies of relevant work order / history and plans for the area |
18/08/2014 | RTI 01 2014-15 | Sewer network | Maintenance reports, logs and images relating to the sewer network on Resolute Street Sunrise Beach between Constellation Close and Courageous place from December 2013 to February 2014. | Work orders and maps |
10/10/2014 | RTI 02 2014-15 | Water pressure | Occasions where Queensland Fire and Emergency Services have requested changes to water pressure between 01/07/2013 – 31/08/2014 | No records located |
30/09/2015 | RTI 01 2015-16 | Water pipe | Seeking information in relation to a water pipe burst on 22 February 2015 at Yandina Coolum Road, Coolum Beach | Work orders, maps and insurance records |
18/07/2016 | RTI 01 2016-17 | Sewer network | CCTV footage taken of Unitywater’s sewerage network at Broadmeadows Road, Maroochydore QLD | CCTV picture |
13/04/2017 | RTI 04 2016-17 | Water leak | Lauen Drive, Buderim | Work order report, laboratory tests, customer call transcripts |
12/04/2017 | RTI 05 2016-17 | Water main | Hastings Street, Noosa | Work order, maintenance report |
10/07/2017 | RTI 06 2016-17 | Sewer | Bryce Street, Moffat Beach | Work order, insurance assessor report, infrastructure map |
3/08/2018 | RTI 01 2018-19 | Combination Drain | Combination Sewer Advice | Customer Chronology |
15/11/2018 | RTI 02 2018-19 | Insurance Claim | Sewer Overflow | Customer Chronology |
19/12/2018 | RTI 03 2018-19 | Personal Injury Enquiry | Manhold Incident | Work order and Customer Chronology |
23/04/2019 | RTI 04 2018-19 | Call Centre Recording | Customer call transcript | Customer Chronology |